Things to keep in mind before going for bathroom remodeling

Things to keep in mind before going for bathroom remodeling

Bathroom remodeling is a specialist job, and there are vital considerations for you to take into account before getting down to it. If you are looking to get it done smoothly, then you need to plan well and ahead. Keep in mind that a typical bathroom remodel will take between 4 to 6 weeks. So, whether you are doing it yourself or hiring a general contractor, here are a few tips for you to keep in mind during the remodeling.

What to expect from bathroom remodeling?

Bathroom design and materials

The design element and the choice of materials will require a lot of brainstorming sessions. You should take your time and shop around for the various materials and options available for the bathroom remodeling. You can look through internet sites and photo-hosting sites to better understand different architectural styles and fixtures that can make your bathroom aesthetically pleasing. A general contractor will need to know your ideas and design plans. So, get down to planning your bathroom remodel.

Permits might be required

Once you have created your perfect design, you will need to obtain the required permits from the city council and other officiating agencies as and when required. There are strict codes of regulation regarding water flow, energy usage, plumbing, and lighting. Keep in mind that there might be periodic inspections as well during the remodeling process.

Plumbing fixtures

You will need several plumbing fixtures and associated items like the bathtub, faucets, rough valves, and pipes with bathroom remodeling. Keep in mind that the entire process will go smoothly if you can arrange for all the items before the project’s commencement.

About the cabinets

No modern bathroom is necessarily complete without the cabinets for storage spaces. Keep in mind that if you are going for custom cabinets, you will need time – from anything around 4-8 weeks. So, always make sure you order your cabinets well ahead of time to get them delivered within the work schedule.

Demolition

The standard remodel starts with the demolition of the existing structure. So, make sure that you plan well to maintain property safety before the destruction of the current system.

About framing walls

If you are looking to remove walls or build a pony wall, replace the existing tub, or get a bigger shower stall, you need to get these walls framed and prepped the right way. Make sure that the cabinet builder comes in to take the final measurements before building the newer walls. If not, then the cabinet might not fit in the real estate available.

Installation ideas

Here are a few things that you need to install to improve your existing bathroom.

  1. The rough plumbing, along with the installation of the tub, drains bath, and shower valves.
  2. The rough electrical wiring to take care of the lighting and vent fans.

Paintjob

The last part of the remodeling process is the paint job on the walls and ceilings. Always make sure that the painting is complete before installing the fixtures.

These are the things that you can expect during a bathroom remodeling at your property.